Project Name and LocationNorthern Marmara Motorway / Kocaeli-Sakarya
Contractor Kolin Construction
Date of Start and Date of Completion 2017 -2020
Features of the Project road superstructure, viaduct , bridge, tunnel and retaining wall and ground reinforcement works in the Kocaeli and Sakarya stages of the Northern Marmara Motorway. A total of 690 thousand tons of cement was used within the scope of the project.
Project Name and LocationSabiha Gökçen Additional Runway Construction - İstanbul
Contractor Celikler Holding
Date of Start and Date of Completion 2015 -2019
Features of the ProjectFeatures of the Project Within the scope of Sabiha Gökçen additional runway construction, tunnel concrete of the roads that will be under the runways was made. Approximately 530 thousand tons of cement was used for the project.
Project Name and Locationİzmir-Istanbul Highway / Bursa
Contractor Makyol Construction
Date of Start and Date of Completion 2012 -2019
Features of the ProjectFeatures of the Project Art structures such as road superstructure, viaduct , tunnel and retaining wall were built at the Izmir-Istanbul Highway, Orhangazi start and Bursa exit stages. A total of 400 thousand tons of cement was used within the scope of the project.
Project Name and LocationHigh Speed Train Construction - Bilecik - Sakarya
Contractor Icdas -Cengiz-Belen Construction
Date of Start and Date of Completion 2011 -2012
Features of the Project in the construction of the high-speed train between Bozüyük and Sakarya, engineering structures such as railways, viaducts , tunnels, and ground reinforcement. A total of 200 thousand tons of cement was used for the project.
Project Name and LocationSamsun - Kavak Regional Prison
Contractor Urfa Concrete Construction
Date of Start and Date of Completion 2017-2020
Features of the ProjectFeatures of the Project The S Type Penitentiary Institution Project, the construction of which started in 2017, is on a land area of 283 thousand 952 square meters; It consists of a total construction area of 126 thousand 960 square meters, 57 thousand square meters of access roads and parking lots, 4 thousand square meters of landscape area, 90 thousand square meters of open facility areas. The project, whose construction was completed in 2020, is one of Turkey's most important and largest prisons with a capacity of 2,000 people. There are Juvenile Penitentiary Institution, Open Penitentiary Institution, visitor buildings, technical and administrative buildings and lodging buildings in the prison. While 90 thousand m3 of concrete was poured during the project, 30 thousand tons of cement was used.
Project Name and LocationSamsun and Its Districts Concrete Roads Project
Contractor Hayran Gıda Construction
Date of Start and Date of Completion 2020-2021
Features of the ProjectProject Features In order to make village roads more accessible in 15 districts of Samsun province, a concrete road project was started at the beginning of 2020. Within the scope of the project, concrete pavement was preferred because it is longer lasting and durable, has a cost advantage and is more environmentally friendly, as well as being producible under all conditions. In the project, which started in 2020 and was completed in 2021, a total of 180 thousand m3 of concrete was poured and 60 thousand tons of cement was used.
Project Name and LocationKarakurt Dam/ KARS
Contractor Age İnş.
Date of Start and Date of Completion 2017-2020
Features of the Project Karakurt Dam and HEPP are located on the Aras River in Kars. It is Kars's largest power plant and Turkey's 64th largest Hydroelectric Power Plant. The height of the asphalt core and rockfill dam is 137 meters. A total of 67 thousand tons of cement was used in the project. Karakurt Dam and HEPP produces electricity that can meet the electrical energy needs of 59,075 houses with an average electricity production of 176 million 500 thousand kilowatt-hours.
Project Name and LocationOvit Tunnel/ RİZE
Contractor CMA Ovit
Date of Start and Date of Completion 2012 -2018
Features of the Project The Ovit Mountain Tunnel is on the Ovit Mountain pass in the İkizdere-İspir locality of the highway between Rize and Erzurum . With a total length of 14.3 kilometers, the Ovit Mountain Tunnel is the longest double tube road tunnel in the world. A total of 410 thousand tons of cement was used within the scope of the project.
Project Name and LocationRize-Artvin Airport /Rize-Artvin
Contractor ASL Construction
Date of Start and Date of Completion 2018 -2022
Features of the Project Rize-Artvin Airport, built in Yeşilköy and Pazar coast locations , will be the second sea-filling airport in Turkey and Europe, after Ordu-Giresun Airport. The airport, which will be built in an international conventional size, will have a runway of 3 thousand meters by 45 meters, a connection road called a taxiway of 265 meters by 24 meters and an apron of 120 meters by 300 meters . It is aimed that the project will significantly relieve the Eastern Black Sea transportation, which is in an important position in terms of tourism.
Project Name and LocationZigana Tunnel / Trabzon-Gümüshane
Contractor Cengiz
Date of Start and Date of Completion 2012 -2023
Features of the ProjectFeatures of the Project In the project with a double tube length of 29 kilometers, a total of 26.6 kilometers of excavation work was carried out, of which 13.3 kilometers in both tubes. To date, 68 percent of the concrete lining of the tunnel has been completed. The project will connect Trabzon Port to Central Anatolia. The Zigana Tunnel, which will be one of the largest tunnels in the world, will be located on an important axis connecting the south of Turkey to the east, as well as being a logistics corridor connecting Trabzon Port to Central Anatolia.
Project Name and LocationBayburt Airport / Bayburt
Contractor Bayburt Group
Date of Start and Date of Completion 2016 -2023
Features of the ProjectFeatures of the Project At Gümüşhane-Bayburt Airport, which is under construction in the Köse district of Gümüşhane, 67 percent of the infrastructure works have been completed. At the airport, it is aimed to make the first flights in 2023 after the infrastructure and superstructure works. With a runway length of 3 kilometers and a width of 60 meters; Bayburt Airport, which is expected to serve 2 million passengers, will offer an alternative especially for aircraft that cannot land on the coastline due to weather conditions.
Project Name and LocationSamsun - İlkadım Toybelen Industrial Site
Contractor Ahes Construction and Trade Inc.
Date of Start and Date of Completion 2021-2022
Features of the ProjectFeatures of the Project Toybelen Industrial Site Project, Turkey's first industrial urban transformation project, is being built on 700 acres. Within the scope of the project, a total of 1,526 workplaces will be built, including 348 workplaces of 100 square meters and 1,178 workplaces of 200 square meters. In addition, a total of 82 commercial units, 25, 50, 100 and 150 square meters, will be completed. In the project, which is planned to use a total of 200 thousand m3 of concrete, it is planned to use 70 thousand tons of cement.
Project Name and LocationSamsun - Canik Emlak Konut
Contractor Aydur İnş. – Serra Eng. Joint Venture Inc.
Date of Start and Date of Completion 2020 - 2021
Features of the ProjectFeatures of the Project Canik Emlak Konut Project, which is one of the largest urban transformation projects in the region, is built on 77 acres. Within the scope of the project, a total of 30 blocks, 684 flats and 29 shops were built. The project, which has reached its final stages, is expected to be completed by the end of 2021. A total of 120 thousand m3 of concrete was used in the project, and 40 thousand tons of cement was also used.
Project Name and LocationYusufeli Dam/ Artvin
Contractor LİMAK İnşaat San. ve Tic. Inc.
Date of Start and Date of Completion 2013 -2022
Features of the ProjectFeatures of the Project Yusufeli Dam, which is the 3rd in the world's 'double curvature thin arch dam type' category and the highest dam in our country with a height of 275 meters, will meet the electricity needs of 2.5 million people when completed. Aşkale Çimento supplied all the cement for the Yusufeli Dam, which was built on the Çoruh River in Artvin and has poured 5.5 million cubic meters of concrete with the work that has been going on for 8 years. Within the scope of the project, a total of 1 million 815 thousand tons of cement has been used so far.
Project Name and LocationYusufeli Dam Bridges /Artvin
Contractor Nurol - Gülsan Adi Ort.
Date of Start and Date of Completion 2018 -2022
Features of the Project Features of the Project The project is being implemented within the scope of the displacement of the existing roads in the region that will be inundated following the completion of the construction of Yusufeli Dam and Hydroelectric Power Plant . Within the scope of the project, four separate viaducts with 2 x 1 lanes are being constructed on an area of 35,000 m2, with a total length of 2.209 m, reaching 152 meters in height. A total of 78 thousand tons of cement has been used in the project so far.
Project Name and LocationYusufeli Dam Village Roads Construction /Artvin
Contractor Medsan Energy Construction
Date of Start and Date of Completion 2018 -2022
Features of the ProjectFeatures of the Project The project is being implemented within the scope of the displacement of the village roads in the region that will be inundated after the construction of Yusufeli Dam and Hydroelectric Power Plant . A total of 50 thousand tons of cement has been used in the project so far.
Project Name and LocationKop Tunnel /Bayburt
Contractor Bayburt Group
Date of Start and Date of Completion 2012 -2023
Features of the ProjectFeatures of the Project It is a 13 km long double tube tunnel project located on the Bayburt-Erzurum Aşkale route. A total of 167 thousand tons of cement has been used in the project so far.